Availability:
Available in 10-14 working days
Product details
3 meter battery cable | Easy installation |
Necessary for CO2-free power generation |
Product description
The battery cable allows the water to be heated by a rechargeable battery. When the battery is fully charged, the boiler will automatically turn on and convert the energy surplus into heat. In the first priority, the battery is charged by the photovoltaic panels, once it is full, the surplus is used for heating water.
Connection to the boiler
Installing the battery cable is simple and only takes a few minutes. Plug the battery cable into the socket provided on the bottom of the boiler. Connect the open ends of the cable directly to the positive and negative terminals of the battery.
Details
Depending on the voltage of the connected battery, the appropriate mode is selected on the photovoltaic boiler. Essentially, the mode is selected depending on the battery voltage used. In total, 6 different modes can be selected with each boiler.
1x battery cable, 1x user manual
Connection to the boiler
Installing the battery cable is simple and only takes a few minutes. Plug the battery cable into the socket provided on the bottom of the boiler. Connect the open ends of the cable directly to the positive and negative terminals of the battery.
Details
- 12V / 24V battery: Direct connection of 12V and 24V batteries to the boiler.
- On / Off: The boiler itself detects when the battery is fully charged. This happens fully automatically.
- Integrated deep discharge protection: The connected battery is protected against deep discharge. You do not need any additional systems.
- 3 meter connection cable for easy and quick installation.
- Easy installation: self-explanatory installation ensures quick commissioning of the photovoltaic boiler.
- 6 boiler modes can be set: depending on the mode of operation of the boiler, the appropriate mode can be set.
Depending on the voltage of the connected battery, the appropriate mode is selected on the photovoltaic boiler. Essentially, the mode is selected depending on the battery voltage used. In total, 6 different modes can be selected with each boiler.
- Mode 1: Photovoltaic mode (standard)
- Mode 2 and 3: 12V battery mode
- Mode 4: 12V / 24V battery modes when using own energy management system
- Mode 5 and 6: 24V battery mode
1x battery cable, 1x user manual
Features
Type battery | Accessories |
Type Sanitary accessories | Other |
Colour | black |
Weight | 200 g |
Length | 3 m |
ean | 4260714970051 |
Manufacturer Article No. | 2011-BC03 |